GNSS RTK baseline planning — Archaeological excavation grid control
GNSS RTK baseline planning for archaeological excavation grid control: field procedures, a worked example, independent checks and traceable survey evidence.
Dates from 2021 to 2026 organize this practical case library. These guides were first prepared and published on 4 November 2026.

Site conditions and the survey decision
This practical case focuses on gnss rtk baseline planning in archaeological excavation grid control. This guide combines the technical method with a practical site scenario and a worked quality check. Start by separating the feature that must be mapped from the coordinate that the receiver happens to display. The feature definition, reference system, observation conditions and independent evidence belong to the same decision. A precise-looking coordinate is not sufficient when any of those elements is ambiguous. Use the scenario to prepare a field plan, then confirm the actual acceptance requirements with the project specification before collecting production observations.
An archaeological excavation grid needs a stable connection between site control, trench references and individual records. A grid corner can be lost or moved as excavation progresses. Define the grid origin, orientation and height convention before collecting coordinates. GNSS may establish exterior control while a separate method supplies measurements inside an obstructed trench.
Preserve the relationship between excavation identifiers, physical marks and the external coordinate reference. Document any measured offsets or transformations and test them with independent points. Keep observed context limits separate from later interpretation. When the grid is re-established, retain the old and new evidence instead of overwriting the historical reference. A future reviewer should be able to connect a recorded object to the grid and understand how that grid was tied to the wider survey.
Read the original method guidePlanning RTK baseline length before fieldwork
Start with the survey decision
Baseline length is the separation between the reference receiver and the rover. For a single base RTK survey, that separation changes as the crew moves around the project. A plan should therefore describe the longest working baseline as well as the convenient distance at the first point. Plot the reference location and the outer limits of the work on a map before deciding where the equipment belongs.
Begin with the deliverable. Locating approximate assets, transferring construction control and surveying drainage elevations place different demands on the observations. Record the required horizontal and vertical checks separately. The distance written in a receiver brochure is a capability statement under stated conditions; it does not replace a project acceptance procedure. A short baseline also cannot rescue a wrong base coordinate or an unstable antenna mount.
Understand what separation changes
Relative positioning benefits when the base and rover experience similar errors. As their separation grows, atmospheric effects can become less alike. Satellite visibility may differ too: a base on an open roof and a rover beside a concrete wall do not share the same signal environment. This is why a distance alone cannot predict whether a particular occupation will produce a reliable result.
Consider the vertical dimension of the project as well. A receiver on a ridge and one in a valley may experience different local conditions even when their horizontal separation seems modest. Keep weather observations and site descriptions with troublesome sessions. They help the office distinguish a communications problem, an obstruction problem and a possible modelling problem without assuming that every failure has the same cause.
Continue learningIndependent GNSS check points — Archaeological excavation grid control
Map practical base options
Identify several candidate reference sites rather than selecting the geographical centre automatically. A useful base needs stable support, clear sky, appropriate access and a practical way to communicate with the rover. A central position hidden beneath trees may perform worse than a slightly more distant open location. Visit candidate sites or obtain recent photographs before promising a daily production rate.
Show the expected coverage of each setup on the project map. If the project is elongated, moving a temporary base between planned sections may be more manageable than stretching a single setup across the whole corridor. Each move introduces a new setup and coordinate assignment that must be checked. Label the resulting work zones so data from different reference arrangements remain distinguishable in the archive.
Separate radio reach from positioning quality
A radio connection can disappear while satellite tracking remains healthy. Conversely, a strong radio signal does not prove that the rover shares a suitable reference environment. Test both systems. For a radio link, examine terrain, vegetation, antennas and permitted operating settings. For an internet link, test the connection along the actual route rather than relying on a coverage map for the nearest town.
During a reconnaissance test, log baseline length, correction age, solution state and an independent check result at several representative locations. Include the least favourable part of the work area. A successful test beside the parked vehicle is useful for equipment setup, but says little about a river bend or a hillside beyond a ridge. Keep failures as evidence instead of deleting them from the test record.

Illustrative GNSS survey photograph; this is not a photograph of the simulated case site.
Use a trial to establish a working envelope
Choose known or independently established check points distributed through the work. Occupy them with the intended settings and equipment arrangement. Repeat important checks after a fresh initialization and at another time when practical. Compare horizontal and height differences separately. This trial establishes whether the planned method works for the project, rather than assigning a universal acceptable distance to every receiver and environment.
The test record should explain its limits. If all checks were made in open ground, state that canopy and street canyon work remains untested. If only one day was tested, do not present the result as an assurance for every atmospheric condition. A useful working envelope includes the configuration, the type of environment and the actions required when field conditions fall outside the trial.
Continue learningGNSS RTK baseline planning — Post-disaster access assessments
Define when the crew changes method
Write a practical escalation rule before starting production. Increasing correction age, unstable ambiguity resolution, repeated check failures or an unexpected coordinate offset should trigger investigation. The response might be to improve communications, move to a clear point, use another approved reference setup or collect raw data for an alternative processing method. Merely extending the occupation indefinitely is not a complete troubleshooting strategy.
If a base is moved, preserve the original work and identify the transition clearly. Confirm the new reference coordinate, antenna height and job coordinate system. Check a common point between the two work zones. That common observation is especially useful for finding a setup error that would otherwise look like a sudden change in the landscape. Never silently combine zones that disagree beyond the project criteria.
Report the arrangement that actually worked
In the final survey note, list the base location, coordinate source, operating dates and the range of baseline lengths used. Describe important changes from the original plan. Include the check results that support acceptance and identify any areas measured by another method. The report should allow a colleague to understand why the chosen arrangement was reasonable without having been present in the field.
Retain raw observations when available and permitted by the workflow. Their value is not that they automatically repair every real time result, but that they preserve evidence for later analysis. A well planned baseline strategy connects site reconnaissance, equipment configuration, verification and reporting. That connection is more useful than repeating an attractive maximum range without describing the conditions that make the range meaningful.
An example of dividing a corridor
Consider a hypothetical corridor with open ground near its western end and a ridge near its eastern end. One central base might appear economical on a map, yet reconnaissance could show that the ridge interrupts the radio path. The plan should compare a second reference setup, an internet correction path and an alternative method for the obstructed section. Each option has different setup and verification work, so the cheapest equipment arrangement is not necessarily the simplest survey workflow.
If two base setups are selected, identify a shared check area and preserve the coordinate source for each reference. Measure suitable common points and compare the resulting coordinates before combining production files. The overlap is a deliberate test of consistency between work zones, not a reason to adjust one zone informally until its edge looks smooth. This example shows why baseline planning belongs with communications reconnaissance and coordinate control: the workable solution depends on all three, and its acceptance should be documented before the final merge.
Continue learningGNSS carrier phase and code checks — Archaeological excavation grid control
Calculate the horizontal independent-check residual
All example values are simulated for training. They are not field measurements, equipment guarantees or project acceptance limits.
For this training example, the east-coordinate difference is 32 mm and the north-coordinate difference is 5 mm. The horizontal residual is the square root of the sum of their squares, giving 32.4 mm. Compare that residual with the illustrative project check limit of 25 mm. The limit is an example input, not a universal GNSS accuracy claim. Use coordinates in the same reference system and units before calculating the difference; agreement between incompatible reference systems is not a valid check.
The alternative observation has a horizontal residual of 21.1 mm under the same illustrative limit. Investigate the physical setup, reference coordinates and feature definition before deciding which record to retain. A smaller residual can be useful evidence, but it does not by itself establish that the entire survey is correct. Keep the comparison tied to this check point and to the observation conditions recorded for this case. Plan an additional independent check when the proposed correction would affect a wider set of points.
Use the worked example to plan a controlled check of the factor being investigated. Keep the feature definition and coordinate reference unchanged when comparing observations. Record when each observation was made, what was changed and which checks remained independent. Where repeated observations share the same reference, they can agree with one another and still contain the same systematic error. Use an external check or another defensible measurement method when the consequences of that common error matter. Preserve the assumptions and calculation inputs alongside the result.
| Quantity | Value | Unit |
|---|---|---|
| East-coordinate difference | 32 | mm |
| North-coordinate difference | 5 | mm |
| Horizontal residual | 32.4 | mm |
| Illustrative project check limit | 25 | mm |
Evidence to retain with the deliverable
Retain the original observations, the correction-source identity, antenna-height notes, coordinate reference information and the independent checks together. Include the processing configuration and the reason for every rejected record. Make the retained files readable by someone who was not present at the site. A reviewer should be able to follow the path from the physical feature to the final GIS or CAD object, and should be able to distinguish an observed value from a computed value or an illustrative planning assumption. These records also make a later repeat survey more useful.
Decide whether to accept, repeat or investigate using the project rule written before measurement. If the check fails, preserve both the original and the repeated observations. Do not silently move points, overwrite heights or delete inconvenient residuals to make the dataset appear consistent. Explain the correction and the supporting evidence in the review record. Revisit nearby observations that may share the same setup or processing configuration. A traceable correction is more valuable than a clean-looking file whose measurement history cannot be reconstructed.
Practical checklist
- Map the full work extent and candidate reference sites.
- Test communications and independent coordinates at the difficult locations.
- Record each base move and verify the overlap between work zones.
- Identify the actual physical feature and write its measurement convention before collecting points.
- Confirm horizontal reference, vertical reference, units and observation time together.
- Use the worked values only as an example; apply the project's documented acceptance rules.
- Retain independent checks and investigate discrepancies before changing production coordinates.
- Archive original observations, site evidence and the reason for each review decision.